Projects · Commercial Project

In-Slab Snow Melt System for a Parkade Ramp on 17th Ave SW, Calgary

Project summary: ElectricMan installed an in-slab snow melt system on a 65 ft x 16 ft parkade ramp on 17th Ave SW. The system runs on a 208V 3-phase panel with two-stage controls and passed both the rough-in and final City of Calgary inspections.

Location17th Ave SW, Calgary, AB
Project typeCommercial
ServicesSnow melt / heat cable installation, controls, 3-phase wiring
In-slab snow melt ramp install on 17th Ave SW Calgary - ElectricManIn-slab snow melt ramp install on 17th Ave SW Calgary - ElectricManIn-slab snow melt ramp install on 17th Ave SW Calgary - ElectricManIn-slab snow melt ramp install on 17th Ave SW Calgary - ElectricMan

The Challenge

Calgary winters make parkade ramps icy and dangerous. The owner wanted a ramp that clears itself instead of relying on shovelling and salt.

What We Did

The Result

The system passed both the rough-in and final City inspections, and the ramp now stays clear through Calgary winters.

Related: Commercial electrical · 12 Days of Electrical Safety

Have a Similar Project?

ElectricMan is a licensed residential and commercial electrical contractor serving Calgary, Airdrie, Cochrane, Okotoks, Chestermere and Canmore.

Email, text or call us: 403-978-0046 · info@electricman.ca · Book online

Frequently Asked Questions

How does an in-slab snow melt system work?

Heating cable is embedded in the concrete. When it runs, it warms the slab from underneath so snow and ice melt instead of building up.

Why test heat cable before and after the concrete pour?

Testing before the pour confirms the cable is intact, and testing after confirms nothing was damaged during the pour. Once concrete sets, a damaged cable is very costly to fix.

What do two-stage controls do?

Two-stage controls let the system ramp up in stages instead of drawing full power at once, which helps keep electrical demand down.

Does a snow melt system need a permit in Calgary?

Yes. This project went through both rough-in and final inspections with the City of Calgary.